Impianto Industriale – Fapat
Client: Fapat
Power: 665kW
Installation: March 2023
Installation carried out in an industrial area in Ovada (AL), on a pitched roof, aimed at the client’s energy optimization. The installation was realized on two separate buildings in order to use as many modules as possible.
Modules: Munchen Energieprodukte 450 Wp
Inverter: Huawei SUN2000-100KTL-M2
Self-consumption: 85%
Plant built in early 2023, has been in operation since Spring of the same year.