Solar Park – Tarsia
Client: Investment Fund
Power: 19 MW
Installation: In progress
The project involves 6 systems installed in the industrial area of Tarsia/ San Marco Argentano (CS). All installations include the use of TOPCon Jolywood 565W Modules mounted on single-axis trackers that allow an increase in efficiency of up to 25%. The expected irradiance is 1900/2000 kWh/kWp.
Modules: Jolywood TOPCon 565 Wp
Inverter: By the client
Structure: Single-axis tracker
The plant’s energy production can meet the needs of about 67,000 households.